Scenario:
I was part of 6 member group for a high-intensity design
project for which we had 12 weeks to do literature review, make the prototype
and get it working. After 6 weeks of vigorous brain-storming ideas presented to
the Professor, not one was selected. Our stress levels began to hike and the team dynamics began to
change for the worse.
The entire team was split into two cliques with one "pushy"
group that wanted to get work done by taking initiative and the "weaker"
group with relatively slower learners who felt that their needs and suggestions
were not being considered. There reached a point where the "weaker"
group decided to walk out of meetings or not respond and the project went downhill.
What was the
conflict? How it happened?
The "pushy" clique was trying to work beyond the
teams equilibrium and this created a backlash by the other clique which thought
that the increased speed is not helping them and that they were being treated
as inferiors. It happened because the members were not being considerate to each other and the
working styles and capabilities differed.
Solution we adopted:
One of us tried to be a mediator and listen to both the
sides and come to a common consensus on how we could work together. We spoke about a more realistic timeline and
the individual roles to adopt based on our capabilities. The first time we
talked, the issued seemed to have resolved. But within a week the same conflict
resurfaced when the actual work in the lab was to be done. In fact the conflict
got worse despite of trying to take a collaborating approach. In the end we did pretty badly for the module too.
What would be a better way to deal with this situation without compromising on the quality of work?